Over many years of trading we have been involved in many large projects including the building of the M6 Toll road, the construction of the new Bullring Centre in Birmingham, upgrading facilities at Birmingham Airport and construction of a new trading estate in Evesham, to name just a few.

Abbey Bridge Evesham

Abbey Bridge Evesham

In Evesham we have been working closely with Hochtief (UK) Construction to demolish and reinstate the Abbey Bridge and viaduct.

The Kubota U50 was fitted with a hydraulic breaker attachment and loaded into a barge on the river in Wyre Piddle, near Pershore. It was then floated to the base of the bridge in Evesham.

The powerful little machine was put through its paces breaking out the extremely hard concrete stanchions that had been in situ for over 60 years.

With compact dimensions we are finding that even in confined spaces we can get this powerful machine in.

These machines can certainly pack a punch with nearly 33kN of digging force and they have a long arm capable of comfortably loading an eight wheel tipper lorry.

Gallery

© Copyright 2014 Henson Plant Hire. Made by Geoff Moore